Scrabster Harbour has now taken operational possession of Phase 1 of its programme of infrastructure development. Phase 1 delivers additional harbour infrastructure with 190 metres of new berthing face with a depth of 7.5 metres at Chart Datum and a new Inner Basin 130 metres long with a depth of 4.5metres. The approach channel to the quays has been dredged to 7.5 m at Chart Datum to ensure full tidal access. The development provides 11,500 square metres of quayside area.